Cutting to final inspection
in our Gimhae plant
Cutting, sewing, welding, inspection and packing are under one roof. We test air permeability and seam strength on every lot and ship a test report with the goods.
Main production processes at our Gimhae plant
Sewing line overview — Gimhae plantTap the center photo to enlarge
04 / 07
Key equipment and
production sequence
- 01 CuttingCut to size, tagged with a lot number
- 02 SewingSewn, then heat-sealed for high-temp bags
- 03 InspectionPermeability, seams, size per lot
- 04 APPROVALPackingTest report enclosed, compressed and sealed
Lot inspection,
intake to shipment
Target values depend on the media and order specification. The values set for each order are stated on the test report.
- 01 IntakeLot and weight check
- 02 PermeabilityTested per lot
- 03 TensileMedia and seams
- 04 DimensionsSize and band fit
- 05 APPROVALShipmentTest report enclosed
- Air permeabilityFrequency Every lot
- Target
- [Target]
- Method
- Frazier-type air permeability test
- Tensile strengthFrequency Every lot
- Target
- [Target]
- Method
- Strip tensile test
- Seam strengthFrequency Every lot
- Target
- [Target]
- Method
- Tensile test on a specimen across the seam
- WeightFrequency At intake
- Target
- [Target]
- Method
- Mass per unit area
- ThicknessFrequency At intake
- Target
- [Target]
- Method
- Thickness measured under constant pressure
- DimensionsFrequency Before shipment
- Target
- [Target]
- Method
- Length and diameter measured, band fit checked
Certifications
We are certified to ISO 9001:2015 for quality management.